Live Workshop: Integrate Google SecOps with Bindplane - Join Us on January 29th at 11 AM ET!Sign Up Now

Progressive Rollouts

Rollout to some collectors and wait before continuing to others

important

Progressive Rollouts are a Bindplane Enterprise Edition feature.

What are Progressive Rollouts?

A Progressive Rollout allows you to rollout a configuration to a pre-defined subset of collectors and pause before continuing the rollout to other groups of collectors.

observIQ docs - Progressive Rollouts - image 1

Defining Stages

To use a progressive rollout, go to the rollout options which are accessible in the configuration details section.

observIQ docs - Progressive Rollouts - image 2

Each stage is given a name and a set of labels. The stage will include all collectors whose labels include every label specified by the stage.

In Action

Once the stages are defined and the collectors are added, Start Rollout will rollout to only the collectors captured by the first stage.

observIQ docs - Progressive Rollouts - image 3
observIQ docs - Progressive Rollouts - image 4

The rollout will continue only when continue rollout is clicked.

Each stage can be hovered to see its name and how many collectors have completed.

observIQ docs - Progressive Rollouts - image 5
observIQ docs - Progressive Rollouts - image 6

The third stage matches collectors that have the env:prod label. Collectors that have already been counted are not added to this stage despite matching the label.

observIQ docs - Progressive Rollouts - image 7
observIQ docs - Progressive Rollouts - image 8

Unassigned

There are still some collectors that have not been matched by any of the stages. There is always a final stage added to capture these collectors.

observIQ docs - Progressive Rollouts - image 9

Empty stages

Sometimes a stage does not match any collectors. The rollout can be continued through this stage, doing nothing.

observIQ docs - Progressive Rollouts - image 10